{"version":"https://jsonfeed.org/version/1","title":"Tethion","home_page_url":"https://tethion.co.uk","description":"Tethion","author":{"name":"Tethion"},"items":[{"id":"https://tethion.co.uk/blog/f/action-blueprint-%E2%80%93-three-reasons-to-engage-manufacturers-earlier","html_content":"<img src=\"https://img1.wsimg.com/isteam/ip/2d9c0e3d-52cc-4ba2-9c1e-e3679731e063/ProfilePic-Square.png\"/><p>“Projects tend to benefit most when manufacturers and specialists are engaged early enough to influence decisions, rather than being asked to validate them afterwards.“</p>","url":"https://tethion.co.uk/blog/f/action-blueprint-%E2%80%93-three-reasons-to-engage-manufacturers-earlier","title":"Action Blueprint – Three reasons to engage manufacturers earlier","summary":"“Projects tend to benefit most when manufacturers and specialists are engaged early enough to influence decisions, rather than being asked to validate them afterwards.“","date_modified":"2026-07-04T21:49:06Z"},{"id":"https://tethion.co.uk/blog/f/handing-over-through-the-lens-of-a-principal-dutyholder","html_content":"<img src=\"https://img1.wsimg.com/isteam/ip/2d9c0e3d-52cc-4ba2-9c1e-e3679731e063/ChatGPT%20Image%20Jul%204%2C%202026%2C%2010_05_45%20PM.png\"/><p>\"When the principal designer’s (or the principal contractor's) appointment ends, no later than 28 days after the end of the appointment, (the dutyholder must) give to the client a document explaining the arrangements it ...</p>","url":"https://tethion.co.uk/blog/f/handing-over-through-the-lens-of-a-principal-dutyholder","title":"Handing over through the lens of a Principal Dutyholder","summary":"\"When the principal designer’s (or the principal contractor's) appointment ends, no later than 28 days after the end of the appointment, (the dutyholder must) give to the client a document explaining the arrangements it ...","date_modified":"2026-07-04T21:40:42Z"},{"id":"https://tethion.co.uk/blog/f/do-you-need-building-control-approval","html_content":"<img src=\"https://img1.wsimg.com/isteam/ip/2d9c0e3d-52cc-4ba2-9c1e-e3679731e063/Screenshot%202026-03-23%20121047.jpg\"/><p>\"We’re only replacing a couple of fire doors, so we don’t need Building Control Approval.\"</p>","url":"https://tethion.co.uk/blog/f/do-you-need-building-control-approval","title":"Do you need Building Control Approval?","summary":"\"We’re only replacing a couple of fire doors, so we don’t need Building Control Approval.\"","date_modified":"2026-07-04T21:33:02Z"},{"id":"https://tethion.co.uk/blog/f/future-healthcare-fire-safety-design","html_content":"<img src=\"https://img1.wsimg.com/isteam/ip/2d9c0e3d-52cc-4ba2-9c1e-e3679731e063/1771149479838.jpeg\"/><p>In February, HTM 05-01: Managing Healthcare Fire Safety was updated. This is not a routine refresh. The revision materially strengthens the governance framework for fire safety across the healthcare sector.</p>","url":"https://tethion.co.uk/blog/f/future-healthcare-fire-safety-design","title":"Future healthcare fire safety design","summary":"In February, HTM 05-01: Managing Healthcare Fire Safety was updated. This is not a routine refresh. The revision materially strengthens the governance framework for fire safety across the healthcare sector.","date_modified":"2026-07-04T21:24:37Z"}]}